Catch costly surprises before they reach the jobsite.
We build AI tools that read your drawings, quotes, schedules and site photos, and show what doesn’t line up.

01Check the bidBefore you price
Find what the bid missed.
A door left off a sub’s quote is a door you pay for later.
You can use this.
- Switch the count
Door sub’s quote, line 1Interior doors D1 to D10, supply and installQty 10
- Situation
You’re pricing the Level 2 doors.
- Finding for review
D11 and D12 may be missing from the quote. It could be deliberate. Your estimator decides.
- Next step for your team
Confirm the count with the sub.
Know what to check before you commit to a price.
02Understand the changeWhen the client changes it
See what a change affects.
Two extra rooms also land in the quote, the board order and the electrician’s week.
You can use this.
- Switch the plan
- Situation
The quote and the orders are already placed.
- Finding for review
Three open questions for the change review. Nothing is approved.
- Next step for your team
Send the client a change proposal.
Agree to the change knowing what it touches.
03Check what’s builtWhile it goes up
Compare the plan with the site.
We match your photos and scans to the model while the walls are still open.
Click the finding.
- Check the install schedule
- Situation
The 14 May capture shows the same opening.
- Finding for review
No door visible in this capture. That doesn’t mean it’s missing.
- Next step for your team
Ask the site team to check C-14.
Give the site team a specific place to look.
04Find a way forwardWhen a delivery slips
Test the next move before moving the crew.
The flooring’s late. The work that doesn’t need it can move up.
You can use this.
- Switch the sequence
- Flooring deliveryLate
- Floor layingStill after delivery
- Ceiling fixturesMoved up
- Wall paintingMoved up
- Final cleanStill last
Finished walls may need protecting. Assumes the rooms, materials and crew are free.
- Situation
The finishes were queued behind it.
- Result for review
A different order of work to review. It rests on assumptions the planner hasn’t checked.
- Next step for your team
The planner checks it before anything is rescheduled.
Weigh the tradeoffs before you change the plan.
How we start
Start with one project and one problem.
- 01Pick one problem
One bid, change, site check or schedule.
- 02Gather what it uses
The drawings, quotes, orders or captures.
- 03Run it alongside
Beside how you work today. Your team decides.
Which problem is costing your team time or money?
Bring us the one that keeps coming back.
Talk through a project